Pressure Vessel Stage Inspection Checklist (ASME Sec VIII / IS 2825)

A stage-by-stage inspection checklist for pressure vessel manufacturers and buyers, from drawing review to name-plate stamping.

2026-10-23 · Pressure Vessels · Vistra Inspection Services and Consultants

Use this checklist when preparing the QAP for a pressure vessel or when planning TPI visits.

1. Before fabrication

  • Design calculations and GA drawing approval
  • Material identification and MTC review for shell, heads, nozzles and flanges
  • WPS/PQR and welder qualification review
  • NDT procedures and technician qualifications

2. During fabrication

  • Plate marking, cutting and edge preparation
  • Dished end thickness and profile after forming
  • Long-seam and circ-seam fit-up
  • Back-gouging and root-pass checks
  • Nozzle orientation, projection and elevation
  • Radiography / UT of seams as per joint efficiency

3. Heat treatment and testing

  • PWHT procedure and chart review
  • Hardness checks after PWHT where required
  • Hydrostatic test at the calculated test pressure
  • Pneumatic test safety precautions, if applicable

4. Final

  • Final visual and dimensional inspection
  • Painting and DFT
  • Name-plate stamping
  • Manufacturer's data report and dossier

Register on the Vistra portal to find qualified pressure vessel inspectors in your district.

Need help? Request an inspection quote or register free to connect with inspectors near you.
All 36 States & UTs780 districts covered
Qualified inspectorsASNT / ISO 9712 Level II & III
Reports in 24 hoursPhoto-backed, code-referenced
Secure paymentsUPI · Cards · Net banking
Install the Vistra appFaster access to inspectors & requirements