Power Plants, Boilers & IBR – Requirements Shop
IBR, ASME Sec I and power plant equipment inspection – boiler tubes, headers, drums and pressure parts.
Power Plants, Boilers & IBR – inspection requirements
Boilers and their pressure parts in India are regulated by the Indian Boiler Regulations (IBR). Manufacturers in Trichy, Ranipet, Pune, Vadodara and Kolkata supply drums, headers, coils and piping to power, sugar, steel and process plants.
Boiler Pressure Part Inspection – IBR
Inspection of tubes, headers and coils with IBR documentation review.
Boiler Overhaul Inspection Package
Annual overhaul inspection with thickness survey and NDT.
Also needed in power plants, boilers & ibr
Supplier Capability Audit – Any Sector
Scored audit of a new supplier's facilities, machines and quality system.
QAP / ITP Preparation for Your Product
Quality assurance plan and inspection test plan ready for buyer approval.
QA/QC Inspector on Deputation
Qualified QA/QC engineer or welding inspector for your project.
Training for your team
Radiography Testing (RT) Level II with Film Interpretation
Radiographic technique, image quality, film interpretation (RTFI) and radiation safety awareness.
Ultrasonic Testing (UT) Level I & II
Flaw detector calibration, angle and normal beam scanning of welds, plates, forgings and castings.
Hardness Testing Course (Brinell, Rockwell, Vickers, Leeb)
Bench and portable hardness testing, conversions and PWHT verification.
Magnetic Particle Testing (MPT) Level I & II
Hands-on yoke, prod and bench MPT with visible and fluorescent particles.
Need an inspector, NDT technician or QA/QC consultant?
Tell us the product, code, location and dates – we respond within one working day.